Ongoing and Finished Projects
Vaqueril, Malpica de Tajo (Toledo), Spain (2016)

Vaqueril, Malpica de Tajo (Toledo), Spain (2016)
Farm with 3,000 mothers with transition located in the municipality of Malpica de Tajo. OPP Group collaborates in every aspect of the facility design, from the installation of feeding systems to plastic floor and heating systems.
Construction Year:
2016
Size:
3.000 hogs and transition phase
Location:
Malpica de Tajo, Toledo
Equipment:
- SCHAUER Compident VII Electronic feeding stations for sows in gestation phase
- SCHAUER Compident Smart Electronic feeding stations for sows in gestation phase
- Thermo W MIK floor and heating systems
- SCHAUER Spotmix multi-phase feeding system for piglets
- SCHAUER Spotmix multi-phase feeding system for sows
- SCHAUER Babyfeed milk ditribution system for piglets
The Project we undertook alongside OPP Group was planned and executed with absolute professionalism and in a concise, timely and reliable manner. What else can one ask for?